Inspect what matters, when it matters.
A structured RBI workflow for static equipment: damage mechanism review, probability of failure (POF), consequence of failure (COF) and final risk category. Inspection method, interval and next date are generated automatically from the risk result, and every assessment is kept for comparison with the next cycle.
API RP 580 / API RP 581 (Level 1 and Level 2)
Inspection Engineers and Integrity Engineers
PIP Code-compliant inspection intervals for vessels, piping and tanks.
FFS Run, repair or replace, decided on engineering evidence.
LOC See and close every active leak against its deadline.
Book a walkthrough with our integrity engineers. We’ll show you the modules that matter for your facilities, using your equipment types and damage mechanisms.
Or email technicals@geekyexperts.com
Developers of NO-LEAK AIM — asset integrity management software for the oil and gas industry.
Request a Demo Follow us on LinkedIn