NO-LEAK module · RBI

Risk Based Inspection

Inspect what matters, when it matters.

Overview

What it does

A structured RBI workflow for static equipment: damage mechanism review and assessment, probability of failure (POF), consequence of failure (COF) and final risk category. Inspection method, interval and next date are generated automatically from the risk result.

Standards reference

API RP 580 / API RP 581 (Level 1 and Level 2)

Primary users

Inspection Engineers and Integrity Engineers

Capabilities

Key features

Deliverables

Outputs

Product screenshot coming soon
Works with

Related modules

Prescriptive Inspection — Pressurised

PIP Code-compliant inspection intervals for vessels, piping and tanks.

Fitness-For-Service

FFS Run, repair or replace — decided on engineering evidence.

Loss of Containment

LOC See and close every active leak against its deadline.

See the Risk Based Inspection module in action

Book a walkthrough with our integrity engineers. We’ll show you the modules that matter for your facilities, using your equipment types and damage mechanisms.

GEEKY EXPERTS LTD